The News-Release
Map Program.

When you’re drilling, every release needs a fast, on-brand, consistent map. We keep a locked, house-styled base for your project and turn each set of results into an investor-ready map on a set schedule. One monthly fee, no per-map back-and-forth.

From $3,000 / month · No setup fee · 6-month minimum

Limited availability

New Found Gold, Queensway.

Your maps on a cadence, not a quote.

Most news-release maps are the same map with new drill data. So we build your base once (the house-styled property base, the drill-hole and label template, the legend) and lock it. After that, each release is a fast, faithful update to that base instead of a fresh project.

You get a set number of maps every month, produced to one standard, with a 48-hour turnaround from clean data (two business days) and priority over one-off work. Your desk can plan around it, and your investors see the same standard every time.

Pick the cadence that matches your drilling.

Every program is billed monthly with a 6-month minimum (a drill season and its results), then continues month-to-month until you cancel.

Cadence
$3,000 / mo
Up to 4 maps / month · 48h turnaround
  • Locked house-styled base
  • Drill-hole & label template
  • Priority over one-off work

Works out to ~$750 per map on a 48-hour turnaround, vs $1,200 one-off.

Talk to us

Billed in Canadian dollars. Euro and pound amounts are shown for comparison.

Not ready to commit?

Ask Dorian first.

One line is enough: where you’re drilling and when results land. Dorian Leslie, our founder, replies personally within one business day. No call needed.

Or start smaller: a single news-release map from $1,200. Price one map →

Programs start by invoice. Talk to us and we’ll set yours up.

No setup fee: your locked base map is built in your first month. Maps beyond your monthly tier are billed at the $750 member rate, vs $1,200 one-off. New base maps, cross-sections, 3D models, and area-play maps are quoted separately. Prefer to pay by invoice? Book a call and we’ll set it up.

Program or retainer? A monthly retainer keeps your deck, fact sheet, site, and existing maps current at standard turnaround. The Map Program is built for drill season: new news-release maps on a 48-hour turnaround, ahead of all one-off work.

West Red Lake Gold, release after release.

West Red Lake Gold works on this cadence: around ten maps a month for its news releases at Madsen and Rowan, each built on the same locked base so every figure reads the same from one release to the next.

Accurate and informative images are essential in communicating exploration and mining news effectively. Dorian and his team handle this important job with precision and speed. They do far more than simply create images.
Will Robinson · VP Exploration, West Red Lake Gold

Written for the budget memo.

  • Term. A 6-month minimum (a drill season and its results, six monthly payments), then month-to-month. Cancel any time after the sixth month.
  • Pause. Between programs, pause for up to six months with your locked base retained. Paused months don’t count toward the minimum. Come back within twelve months and we start again from your locked base.
  • Capacity. Your tier buys standing capacity and priority, not map inventory. Unused maps don’t carry forward.
  • Turnaround. 48 hours means two business days from clean, complete data, for up to two maps per request. Larger batches get a delivery schedule agreed with you.
  • Billing. No setup fee. Maps beyond your tier at the $750 member rate. Monthly, in CAD.

Companies in an active program.

If you’re drilling and releasing results on a regular cadence, a map should never be the thing that holds a release. The Program is built for explorers and developers with a steady flow of news, so every result lands with a clear, consistent, investor-ready map, and your house style compounds instead of drifting release to release.

Unreleased results stay unreleased.

The Program handles material information before it’s public, and we treat it that way. A standing NDA is available on request. Access is restricted to the team assigned to your account, and unreleased results are held off shared systems until your release crosses the wire.

Your data. Your QP’s sign-off.

The Program fits inside your disclosure process. Your team sends the data; we draft the map on the locked base; your Qualified Person reviews and approves it; then it goes out with the release. We never publish anything; approval stays with you.

Common questions.

How fast can I get a drill-results map for a news release?

On the Exploration Sites News-Release Map Program, within two business days of clean, complete data (collar, survey and assay tables plus the text you want on the map), for up to two maps per request. Larger batches get a delivery schedule agreed with you. One-off maps outside the program typically take 3–7 business days.

How much does a news-release map cost?

At Exploration Sites, a one-off map starts at $1,200 CAD. On the News-Release Map Program, maps come as monthly capacity: Cadence is $3,000/month for up to 4 maps ($750 a map) and Active Drill $5,000 for up to 8 ($625 a map), with no setup fee and a six-month minimum. Extra maps are $750 each. All prices are in Canadian dollars, before tax.

What do you need from us?

Claim boundaries and your drilling to date: collars, downhole surveys and assays, or just the drill-database export. For each new set of results, send the new holes' data. Your Qualified Person reviews and approves every map before release.

Can we pause between drill programs?

Yes. You can pause for up to six months, with your locked base map kept. Paused months don't count toward the six-month minimum.

Drilling this year?

Tell us your release cadence and we’ll size the right program.

Book a discovery call See the maps in the case studies